| Agency | Form: (02) 2581589 05/11/2010 | Prior to recomplete, operator must:
1) Verify existing cement with a cement bond log.
2) If it is not present as follows, provide remedial cement 200’ above Niobrara (minimum cement top of 6830’), 400’ (DV tool) into the surface casing shoe. Verify remedial cement coverage with cement bond log. |
| Engineer | Form: (06) 400689376 09/26/2014 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) If unable to pull casing contact COGCC for plugging modifications.
3) For 580' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 203’ or shallower.
4) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
5) Please submit gyro survey data with Form 6 (s) Subsequent Report of Abandonment. |