Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-08289NORMAN MOSER
B-1
KP KAUFFMAN COMPANY INC
46290
SI
11/1/2025
SPINDLE
77900
WELD  123
SWNE 10 1N66W 6
318049View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
401937904
02/21/2019
1) Prior to starting repair work a bradenhead test shall be performed. If the beginning pressure is greater than 25 psi, or if pressure remains at the conclusion of the test, or if any liquids were present contact COGCC Engineer for sampling requirements before pumping any cement. The Form 17 shall be submitted within 10 days of the test. 2) No CBL on file with COGCC, verify existing cement with a CBL. Provide remedial cement to 200' above Niobrara top, from 200' below to 200' above the Sussex formation, and from 1200' to surface. The placed cement shall be verified with a CBL and documented with a Form 5.
 
COGIS - Best Management Practice Results
No records to display.