Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-08038SARCHET
1
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
2/7/2016
WATTENBERG
90750
WELD  123
SWNE 20 2N65W 6
317956View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
1635802
05/20/2011
1)Provide 48 hour notice of MIRU to Jim Precup at 303-726-3822 or e-mail at jim.precup@state.co.us. 2)Place remedial cement to comply with Rule 317.i, set stage cement from 900’ to at least 50’ above the existing surface casing shoe. Increase the proposed cement volume accordingly to provide this required coverage. Also confirm and/or provide, if not currently existing, remedial cement coverage from TD to a minimum of 200’ above Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify with a cement bond log. 3)Within 30 days after recomplete, submit Form 5 with CBL to document remedial cement in accordance with Rule 308A (change of wellbore configuration) and Form 5A to document new status of both formations in accordance with Rule 308B.
EngineerForm: (06)
400940031
01/15/2016
Note changes to plugging procedure: 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) For 300’ plug: pump plug and displace. If surface casing plug is not circulated to surface then tag plug – must be 131’ or shallower and provide 10 sx plug at the surface. Leave at least 100’ of cement in the casing for each plug. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 Form: (06)
401004598
03/23/2018
Form 7 is now okay.
 
COGIS - Best Management Practice Results
No records to display.