COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
400490257
12/18/2013
CBL to be run to confirm stage cement. 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) For 800’ plug: pump plug and displace. If surface casing plug not circulated to surface, then tag plug – must be 480’ or shallower and then provide 10 sx plug at the surface. Leave at least 100’ cement in the casing for each plug. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
PermitForm: (06)
400988748
05/24/2016
Need 5A to report the plugging (AB) of the Codell and Nio in 2013 and JSand in 1992. Need to update the production reporting form 7 to reflect this. Needs to be accomplished before subsequent form 6 is approved.
EngineerForm: (06)
400988748
06/10/2016
1) Prior to starting plugging operations, a bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present contact COGCC Engineer for sampling requirements. The Form 17 shall be submitted within 10 days of the test. 2) Provide 48 hour notice of plugging MIRU via electronic Form 42. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Submit CBL with Form 6 (s) Subsequent Report of Abandonment that shows stage tool at 667' with cement into surface casing. 5) Leave at least 100’ of cement in the wellbore for each plug.
 
COGIS - Best Management Practice Results
No records to display.