COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
400813322
04/01/2015
Note change in plugging procedure: 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) No CBL on file. Run or submit CBL to COGCC. 3) If unable to pull casing contact COGCC for plugging modifications. 4) For 1720' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 688’ or shallower to isolate Laramie Fox Hills aquifer from shallower Lower Arapahoe aquifer. Increase cement volumes accordingly. 5) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 6) Please submit existing gyro survey data with Form 6 (s) Subsequent Report of Abandonment.
EngineerForm: (04)
400931562
11/06/2015
1) The additional cement referenced shall be placed as indicated and comply with Rule 317.j. The placed cement shall be verified with a CBL and documented with a Form 5 Drilling Completion Report. 2) Please submit existing gyro survey data with Form 5 Drilling Completion Report.
EngineerForm: (04)
403047635
05/24/2022
This well may be returned to annual testing and monthly monitoring. If at any point in the future bradenhead conditions meet thresholds defined by Order 1-232 a new bradenhead mitigation sundry must be filed.
OGLAForm: (06)
403141106
08/29/2022
Prior to commencing operations, KMG will post signs in conspicuous locations. The signs will indicate plugging and abandonment operations are being conducted, the well name, well, and the Operator’s contact information. Signs will be placed so as not to create a potential traffic hazard. (operator provided BMP from technical detail/comments section)
OGLAForm: (06)
403141106
08/29/2022
Courtesy notifications will be sent to all parcel owners with building units within 1,500 feet of the location letting them know about our plugging and abandonment operations and providing contact information for Kerr McGee’s response line and online resources. (operator provided BMP from technical detail/comments section)
OGLAForm: (06)
403141106
08/29/2022
Water will be placed on dirt access roads to mitigate dust as needed. (operator provided BMP from technical detail/comments section)
OGLAForm: (06)
403141106
08/29/2022
Operations will be during daylight-only. (operator provided BMP from technical detail/comments section)
OGLAForm: (06)
403141106
08/29/2022
Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units. (operator provided BMP from technical detail/comments section)
OGLAForm: (06)
403141106
08/29/2022
Due to proximity to a riverine feature and surface water, operator will use secondary containment for all tanks and other liquid containers.
OGLAForm: (06)
403141106
08/29/2022
Due to proximity to a riverine feature and surface water, operator will implement stormwater BMPs and erosion control measures as needed to prevent sediment and stormwater runoff from entering the drainage and ponds to the south.
EngineerForm: (06)
403141106
09/01/2022
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. If there is a need for sampling, contact COGCC engineering for verification of plugging procedure.
EngineerForm: (06)
403141106
09/01/2022
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. 2) After placing plug at 4750’ assure that all fluid migration has been eliminated by monitoring the well for a minimum of 8 hours before proceeding to the next plug. If at any time after placing this plug there is evidence of pressure or of fluid migration, contact COGCC engineering before continuing operations. 3) Prior to placing the 1500’ plug: verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 4) If shoe plug cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 935’ or shallower and provide a minimum of 10 sx plug at the surface. 5) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed.
EngineerForm: (06)
403141106
09/01/2022
Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent. Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a COGCC Spill/Release Report, Form 19, associated with the abandoned line.
EngineerForm: (06)
403141106
09/01/2022
Cement placement in or above groundwater zones to be performed in a manner that does not initiate hydraulic fractures.
EngineerForm: (06)
403141106
09/01/2022
Verify existing cement coverage by CBL - submit to COGCC for verification of plugging orders prior to continuing plugging operations.
 