Engineer | Form: (04 ) 401065061 6/20/2016 | 1) Verify cement is at minimum 50’ below Fox Hills Bottom (693’ or deeper) and at minimum 200’ above top perf (4454’ or shallower) with a CBL before completion activity. If cement coverage does not meet requirements contact COGCC before beginning work. Submit CBL showing the required cement.
2) Submit a Completed Interval Report, Form 5A, within 30 days after the perfs are added.
|