| Engineer | Form: (02) 2583434 08/11/2010 | Prior to recomplete, operator must:
1) Verify existing cement with a cement bond log.
2) If it is not present as follows, provide remedial cement 200’ above Niobrara (minimum cement top of 6810’). Verify remedial cement coverage with cement bond log. |
| Engineer | Form: (06) 400901297 09/24/2015 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) If unable to pull casing contact COGCC for plugging modifications.
3) For 990' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 449’ or shallower.
4) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|