| Engineer | Form: (02) 2287886 04/06/2012 | Prior to recomplete, operator must: 1) Verify existing cement above the Niobrara with a cement bond log. 2) If it is not present as follows, provide remedial cement 200’ above Niobrara (minimum cement top of 7110’. Verify remedial cement coverage with cement bond log. |