WELL05-123-07260UPRR 38 PAN AM A
1
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
4/4/2013
WATTENBERG
90750
WELD  123
SWSW 19 2N65W 6
317568View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
400390996
3/18/2013
1) Provide 48-hour notice of MIRU to Jim Precup at (303) 726-3822. 2) No CBL on file. Run a CBL to verify the top of the primary cement and the subsequently squeezed cement interval. These must be at least 200’ over the Niobrara. If not, provide cement, as needed, to ensure adequate Niobrara coverage. Ensure that CIBP #2 is set within a well-bonded interval of the primary cement and revise its depth if necessary. Run a CBL to verify the stage cement pumped through the DV tool. Add cement, as needed, to provide cement from 940’ to at least 50’ within the surface casing shoe. Submit a copy of both CBLs with the Subsequent Report of Abandonment. 3) Provide an “As Plugged” wellbore diagram identifying the specific plugging completed. 4) If unable to pull casing, contact COGCC for plugging modifications. 5) Properly abandon flowlines as per Rule 1103. 6) Operator must tag plugs upon verbal request by the COGCC engineer or COGCC field inspector. 7) See plugging changes above.
 
COGIS - Best Management Practice Results
No records to display.