Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-07215WELD COUNTY POOLING UNIT
1
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
10/10/2014
WATTENBERG
90750
WELD  123
SWNE 26 2N67W 6
311275View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
400668621
08/26/2014
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2)Run CBL to verify the top of primary cement (or additional Niobrara coverage squeezed cement) is at least 200’ over Niobrara and that cement exists from the DV tool to at least 50’ inside the surface casing shoe. If cement in either interval is not present add this coverage by perforating and squeezing. 3) For 1350' plug: pump plug and displace, WOC 4 hours and tag plug – must be 189’ or shallower. 4) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 5) Please submit gyro survey data with Form 6 (s) Subsequent Report of Abandonment.
 
COGIS - Best Management Practice Results
No records to display.