COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401068857
07/11/2016
1) Prior to initiation of plugging operations, a bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present call COGCC Engineer for sampling requirements. Form 17 shall be submitted within 10 days of the test. 2) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 3) Properly abandon flowlines. Once flowlines are properly abandoned, file electronic form 42. 4) For 800’ plug: pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours and tag plug – top of plug must be not deeper than 469’ and provide minimum 10 sx plug inside and outside at the surface. Leave at least 100’ of cement in the wellbore for each plug.
 
COGIS - Best Management Practice Results
No records to display.