| Engineer | Form: (04) 401469229 01/03/2018 | A Form 5A, Completed Interval Report should be filed within 30 days to document the formation abandonment of the Lyons. The wireline job summary for the setting of the bridge plug should be included with the Form 5A. The perforations in the Lyons should be confirmed with the Form 5A. |
| Engineer | Form: (04) 402075575 12/26/2019 | This approval is good for one year and a new application must be made before June 18, 2020. Updates for the planned utilization of the well should be included with the application.
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402407707 06/04/2020 | This approval is good for one year and a new application must be made before May 28, 2021. Updates for the planned utilization of the well should be included with the application.
|
| Engineer | Form: (04) 402407707 06/04/2020 | The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402693328 05/24/2021 | This approval is good for one year and a new application must be made before May 18, 2022. Updates for the planned utilization of the well should be included with the application.
|
| Engineer | Form: (04) 402693328 05/24/2021 | The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|