Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-107-06142EILTS-BRADLEY
1-14
ROBERT L BAYLESS PRODUCER LLC
6720
PA
6/19/2023
BEAR RIVER
5950
ROUTT  107
NENE 14 6N87W 6
316765View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
400817397
04/14/2015
Submit a new Form 4 in 12 months (no later than 4/14/2016) or when a new transporter is available to sell gas, whichever occurs first. The new Form 4 should describe the operator's continued efforts or successful effort to find a transporter.
EngineerForm: (06)
402745138
08/04/2021
1) Perform bradenhead test prior to MIRU if test has not been performed within six months of plugging. Submit results on Form 17. Contact area environmental protection specialist for sampling and analysis requirements if initial bradenhead pressure is greater than 25 psi and contact area engineer. An additional perf and squeeze plug will be required as a protective measure. 2) Provide 48 hour notice of plugging MIRU via electronic Form 42. 3) The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations. 4) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once on location abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator shall submit a Flowline Report, Form 44.
OGLAForm: (06)
402917991
01/18/2022
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment.
EngineerForm: (06)
402917991
02/16/2022
1) Perform bradenhead test prior to MIRU if test has not been performed within six months of plugging. Submit results on Form 17. Contact area environmental protection specialist for sampling and analysis requirements if initial bradenhead pressure is greater than 25 psi. 2) Prior to placing the surface casing shoe plug: verify that all fluid migration (liquid and gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 3) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. 4) The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations. 5) Properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines.
EngineerForm: (04)
403164125
10/06/2022
If well is not plugged by May 1, 2023 an official MIT will need to be performed and submitted on a Form 21 no later than May 15, 2023.
 
COGIS - Best Management Practice Results
No records to display.