Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-66397GRAY "B"
19X
SCOUT ENERGY MANAGEMENT LLC
10779
PR
7/1/2022
RANGELY
72370
RIO BLANCO  103
SESW 18 2N102W 6
316733View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
403656170
1/23/2024
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report or other Director approved submittal method. 2) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 3) Any liquids blown down are to be collected, stored, handled, and treated or disposed as E&P waste per COGCC’s 900 series rules. 4) At least one check valve is required for annular spaces that are tied to sales line or separator. Maintain equipment for pressure regulation and check valves in good working order. 5) At least one valve is required to monitor pressure and sample flow from the bradenhead. 6) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan
 
COGIS - Best Management Practice Results
No records to display.