| Engineer | Form: (02) 402599380 02/22/2023 | 1)Operator shall comply with the most current revision of the Northwest Notification Policy.
2) During stimulation, operator shall monitor the bradenhead, casing, and tubing pressure of the proposed well and all offset wells under Operator’s control which penetrate the stimulated formation and have a treated interval separation of 300 feet or less. Operator shall notify COGCC Engineering staff if bradenhead pressures increase by more than 200 psig.
|
| Engineer | Form: (04) 403571184 12/06/2023 | 1)Operator shall comply with the most current revision of the Northwest Notification Policy.
2) During stimulation, operator shall monitor the bradenhead, casing, and tubing pressure of the proposed well and all offset wells under Operator’s control which penetrate the stimulated formation and have a treated interval separation of 300 feet or less. Operator shall notify COGCC Engineering staff if bradenhead pressures increase by more than 200 psig.
|
| Engineer | Form: (04) 403799681 06/27/2024 | 1) Operator shall comply with the most current revision of the Northwest Notification Policy.
2) During stimulation, operator shall monitor the bradenhead, casing, and tubing pressure of the proposed well and all offset wells under Operator’s control which penetrate the stimulated formation and have a treated interval separation of 300 feet or less. Operator shall notify COGCC Engineering staff if bradenhead pressures increase by more than 200 psig.
3) Operator shall provide cement coverage from the production casing shoe 4 ½” FIRST STRING to a minimum of 200' above all Mesaverde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with a cement bond log.
|
| Engineer | Form: (04) 404474501 12/18/2025 | 1) For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD.
2) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
3) Complete a bradenhead test within 30 days of completing the repair and submit results on a Form 17
4) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations
5) Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure.
6) Complete a Form 21 MIT to verify repairs for injection wells. MIT is required to be approved prior to returning well to injection |
| Engineer | Form: (04) 404474501 12/18/2025 | Well to be repaired within 6 months of identifying the integrity issue |
| Engineer | Form: (04) 404519921 01/28/2026 | 1) For casing and cementing operations, submit a Form 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
2) The placed cement shall be verified with a CBL and documented with a Form 5 within 30 days of repair operations.
3) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations
4) Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure.
5) Complete a pressure test to verify repairs. Submit documentation of the pressure test on the applicable post-work ECMC form. |