| Engineer | Form: (02) 401422136 12/11/2017 | 1)Operator shall comply with the most current revision of the Northwest Colorado Notification Policy.
2)Operator shall provide cement coverage from the production casing shoe (4+1/2" FIRST STRING) to above total vertical depth of 4100’. Isolation is required due to offset Wasatch sand injection. Verify production casing cement coverage with a cement bond log.
|
| Permit | Form: (02) 401422136 12/26/2017 | If conductors are preset, operator shall comply with Notice to Operators: Procedures for Preset Conductors (dated September 1, 2016, revised October 6, 2016). |
| Permit | Form: (02) 401422136 12/26/2017 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017). |
| OGLA | Form: (02) 401422136 01/05/2018 | The moisture content of water/bentonite based mud (WBM) generated drill cuttings managed onsite shall be kept as low as practicable to prevent accumulation of liquids greater than de minimis amounts. The operator has indicated in the ‘DRILLING WASTE MANAGEMENT PROGRAM SECTION’ of the Form 2A; that ‘Cuttings Disposal’ will be “OFFSITE” and that the ‘Cuttings Disposal Method’ will be “Beneficial reuse”, ‘Other Disposal Description’ as “PLEASE SEE ATTACHED WASTE MANAGEMENT PLAN”. Any proposed offsite disposal or beneficial reuse of cuttings to another oil and gas location shall not occur until approval of a Form 4 Sundry Notice specifying disposal or beneficial reuse location and cuttings material sampling and characterization methods. Remediated or amended cuttings shall not be made available as fill material to the general public (as indicated in the Waste Management Plan, item 3 - made available as fill material to the general public”).
Any changes to drill cuttings management and disposal on this location will require submittal (via a Form 4 Sundry Notice) and approval of a Beneficial Reuse Plan detailing the changes (specifying cuttings characterization methods, cuttings management, amendment, and onsite disposal location[s]). Any of the WBM drill cuttings that will remain on the well pad location must be sampled and meet the applicable standards of Table 910-1. |