Site Specific | Form: (02 ) 400239671 4/5/2012 | TWO WELL ARE PLANNED FOR THIS WELL SITE..
|
Drilling/Completion Operations | Form: (02 ) 400239671 4/5/2012 | CLOSED LOOP DRILLING SYSTEM. |
Construction | Form: (02 ) 400239671 4/5/2012 | UTILIZE EXISTING LEASE ROADS TO MINIMIZZE ANY NEW SURFACE DISTURBANCE. TOPSOIL WILL BE SEGREGATED AND STORED FOR RECLAMATION AT A LATER DATE |
Material Handling and Spill Prevention | Form: (02 ) 400239671 4/5/2012 | CHEVRON HAS AN ANNUALLY UPDATED ENFINEER CERTIFIED FULL FIELD SPCC PLAN IN ACCORDANCE WITH THE FEDERAL REQUIREMENT. |