Drilling/Completion Operations | Form: (02 ) 400238886 3/30/2012 | CLOSED LOOP DRILLING SYSTEM |
Storm Water/Erosion Control | Form: (02 ) 400238886 3/30/2012 | STORM WATER PLANS AND EROSION CONTROL METHODS WILL BE USED TO ENSURE SITE STABILIZATION AND TO ENSURE ADEQUATE ENVIRONMENTAL SAFEGUARDS ARE IN PLACE TO PREVENT ANY STORM WATER RUNOFF. INSPECTION WILL BE DOCUMENTED AND FILED IN THE RANGELY FIELD OFFICE. THE CHEVRON RANGELY FIELD HAS A ANNUALLY REVIEWED FIELD WIDE STORMWATER MANAGEMENT PLAN. |
General Housekeeping | Form: (02 ) 400238886 3/30/2012 | THE WELL SITE WILL BE MAINTAINED IN A SANITARY CONDITION AT ALL TIMES AND ALL WASTE MATERIALS SHALL BE DIPOSED OF PROMPTLY AT APPROPRIATE WASTE DISPOSAL SITES. |
Construction | Form: (02 ) 400238886 3/30/2012 | CHEVRON WILL EMPLOY DUST SUPPRESSION TECHNIQUES OF FRESH WATER. UTILIZE EXISTING LEASE ROADS TO MINIMIZE ANY NEW SURFACE DISTURBANCE. ALL NEW ACCESS ROADS WILL BE CROWNED AND DITCHED ACCORDING TO BLM MANUAL SECTION 9113. THE TOPSOIL WILL BE SEGREGATED AND STORED SEPARATELY FOR THE SUBSURFACE MATERAILS. |
Wildlife | Form: (02 ) 400238886 3/30/2012 | POWERLINE DESIGN TO MINIMIZE RAPTOR ELECTROCUTION RISK. THERE WILL BE NO NEW SURFACE WORK FROM APRIL 15-TO JULY 15 TO ALLOW FOR PRAIRIE DOG REPRODUCTIVE PERIOD. |
Material Handling and Spill Prevention | Form: (02 ) 400238886 3/30/2012 | ALL FLUIDS WILL BE STORED IN APPROPRIATE CONTAINERS AND IN SECONDARY CONTAINMENT SYSTEMS ENGINEERED TO CONTAIN 150 PERCENT OF THE LARGEST VESSEL VOLUME. CHEVRON HAS AN ANNUALLY UPDATED ENGINEER CERTIFIED FULL FIELD SPCC PLAN IN ACCORDANCE WITH THE FEDERAL REQUIREMENTS OF 40 CFR PART 112 |
Site Specific | Form: (02 ) 400238886 3/30/2012 | TWO WELLS ARE PLANNED FOR THIS WELL SITE. THIS SITE IS LOCATED OFF EXISTING LEASE ROADS. THIS WELL SITE IS A LEVEL AREA TO MINIMIZE DIRT WORK. THIS WELL SITE IS NOT IN ANY RIPARIAN AREA, FLOODPLAIN, AND IS NOT SUBJECT TO EROSION. IT IS NOT A VISUALLY SENSITIVE AREA. |