Construction | Form: (02 ) 400237211 1/31/2012 | THE CUTTING PITS WILL BE CONSTRUCTED TO BLM GOLD BOOK STANDARDS, NO PORTION OF THE PIT WILL BE CONSTRUCTED ON ANY FILL MATERIAL, THE ENTIRE BASE OF THE PIT WILL BE IN THE CUT.
|
Storm Water/Erosion Control | Form: (02 ) 400237211 1/31/2012 | TOP SOIL SALVAGE AND STORAGE WILL BE WHERE NO VEHICLE TRAFFIC WILL CROSS THE MOUND. WATTLES, DRAINAGE DITCHES AND DIVERSION DITCHES WILL BE CONSTRUCTED IF NEED TO CONTROL EROSION AND STORM WATER RUN OFF. |
Site Specific | Form: (02 ) 400237211 1/31/2012 | THIS WELL SITE WAS SELECTED TO UTILIZE ONE LOCATION FOR 2 DIRECTIONLY DRILLED WELLS. THIS LOCATION IS LOCATEDALON EXISTING LEASE ROAD. |
Drilling/Completion Operations | Form: (02 ) 400237211 1/31/2012 | CLOSED LOOP SYSTEM WILL BE IMPLEMENTED DURING DRILLING, WATER BASED MUD. |