Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-11846UNION PACIFIC
152X16
SCOUT ENERGY MANAGEMENT LLC
10779
AL
10/13/2016
RANGELY
72370
RIO BLANCO  103
NW SW 16 2N102W 6
398839View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400107510
12/7/2010
(1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. (2) CEMENT-TOP VERIFICATION BY CBL REQUIRED. (3) THE MOISTURE CONTENT OF ANY DRILL CUTTINGS IN A CUTTINGS PIT, TRENCH, OR PILE SHALL BE AS LOW AS PRACTICABLE TO PREVENT ACCUMULATION OF LIQUIDS GREATER THAN DE-MINIMIS AMOUNTS. AT THE TIME OF CLOSURE, THE DRILL CUTTINGS MUST ALSO MEET THE APPLICABLE STANDARDS OF TABLE 910-1. (4) THE PROPOSED SURFACE CASING IS MORE THAN 50’ BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1-MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1-MILE IS 00 FEET DEEP.
EngineerForm: (02 )
400237021
1/9/2012
1)COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. 2)THE PROPOSED SURFACE CASING IS MORE THAN 50' BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1 MILE IS 000 FEET DEEP.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400237021
4/5/2012
CLOSED LOOP SYSTEM, WATER BASED MUD.
Material Handling and Spill PreventionForm: (02 )
400237021
4/5/2012
ALL TEMPORARY TANKS ON LOCATION WILL HAVE ENGINEERED CONTAINMENT FOR 150% OF ESTIMATED VOLUME.
Site SpecificForm: (02 )
400237021
4/5/2012
THIS WELL WILL BE UTILIZING AN EXISTING WELL PAD WITH 2 ACTIVE WELLS - NO NEW SURFACE DISTURBANCE FOR WELL PAD OR ACCESS ROADS.
ConstructionForm: (02 )
400237021
4/5/2012
FLOWLINE WILL RUN TO CENTRILIZED COLLECTION STATION, USING THE EXISTING PIPELINE RIGHT OF WAY