Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-11371PICEANCE CREEK UNIT
297-11B8
QB ENERGY OPERATING LLC
10844
PR
2/1/2026
PICEANCE CREEK
68800
RIO BLANCO  103
SESE 11 2S97W 6
335948View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403180230
10/20/2022
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report 2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method. 3) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan 4) Perform diagnostics on BH and Intermediate pressures being the same and report results on Sundry required by COA#3
EngineerForm: (04)
404465099
03/02/2026
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Shut in bradenhead pressure shall not exceed threshold pressure. 3. For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 4. Complete a bradenhead test within 30 days of completing the repair and submit results on a Form 17 5. Well to be plugged or repaired within 6 months of identifying integrity issue
 
COGIS - Best Management Practice Results
No records to display.