| Engineer | Form: (04) 403181116 11/10/2022 | 1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report
2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method.
3) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan -Include diagnostic information on causal factors for intermediate casing pressure.
4) Submit a current WBD on a Form 4 Sundry “COMPLIANCE with CONDITION OF APPROVAL (COA)” by 01/31/23
5) Complete installation of BH monitoring system by 2/31/2023
6) Perform diagnostics on BH and Intermediate pressures being the same and report results on Sundry required by COA#3
|
| Engineer | Form: (04) 404465044 03/04/2026 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Well to be plugged or repaired within 6 months of identifying integrity issue 6/5/2025 |