| Engineer | Form: (04) 400648998 07/28/2014 | 1) Approval of this sundry only addresses the abandonment of the conductor pipe. Operator needs to submit a Form 4 - Rule 502 Variance Requested to obtain a variance from the 1000 series interim reclamation rules.
2) Provide cement ticket with sundry reporting work done. |