COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (04)
403177981
10/25/2022
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well repair/maintenance do not constitute a nuisance or hazard to public health, welfare and the environment.
EngineerForm: (04)
403177981
11/29/2022
1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit one as an attachment. 2) Complete a bradenhead test following completion of the repair and submit results on a Form 17 or directive approved method 3) Complete repair work by 12/31/2023. Repair by date is contingent on approval of Docket#221000272 4) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
WildlifeForm: (04 )
403177981
11/29/2022
Minimization: To minimize the potential for wildlife related traffic accidents, TEP has implemented speed restrictions for all lease roads and requires that all TEP employees and contractors adhere to these posted speed restrictions.
WildlifeForm: (04 )
403177981
11/29/2022
Minimization: TEP will make best efforts to minimize operations at these location during winter months by conducting operations, when possible, between 9:00am to 4:00pm when wildlife activity minimal.