WELL05-103-11071YELLOW CREEK FEDERAL
1-41-1
QB ENERGY OPERATING LLC
10844
SI
10/1/2025
YELLOW CREEK
97955
RIO BLANCO  103
LOT5 1 1S98W 6
316655View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
404621279
04/21/2026
1) For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 2) For applicable operations, submit a Form 5 and/or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run. 3) Complete a bradenhead test within 30 days of completing the repair and submit results on a Form 17 4) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations 5) Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure. 6) Complete a Form 21 MIT to verify repairs for injection wells. MIT is required to be approved prior to returning well to injection
EngineerForm: (04)
404621279
04/21/2026
Well to be plugged or repaired within 6 months of identifying the integrity issue (3/17/26). Pressure is to be managed and mitigated until plugging or repair is complete.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Material Handling and Spill PreventionForm: (04 )
404621279
5/8/2026
Operator will provide maintenance of adequate spill response equipment at the location throughout casing repair/workover operations.
Storm Water/Erosion ControlForm: (04 )
404621279
5/8/2026