WELL05-103-11034BOIES
B-19P-P3
TEP ROCKY MOUNTAIN LLC
96850
PA
5/1/2023
SULPHUR CREEK
80090
RIO BLANCO  103
SESE 19 2S97W 6
335891View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403253773
12/12/2022
1)This well is required to be repaired or plugged by 4/13/2023
OGLAForm: (06)
403319362
03/03/2023
This oil and gas location is located within a CPW-mapped 500 foot buffer of the Ordinary High Water Mark of the Black Sulphur Creek for protection of Aquatic Native Species Conservation Water High Priority Habitat. At a minimum, Operator will review the stormwater program and implement stormwater BMPs and erosion control measures as needed to prevent fine-grained sediment and impacted stormwater runoff from entering surface water.
OGLAForm: (06)
403319362
03/03/2023
Well is in a mule deer migration corridor. Although plugging and abandonment operations with heavy equipment will be allowed, the operator is strongly encouraged to avoid them between December 1 through April 30.
EngineerForm: (06)
403319362
03/06/2023
1)Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. 2)The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations. 3)Operator shall implement measures to control venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard. 4)It applicable properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Work plans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines. 5)Perform bradenhead test prior to MIRU if test has not been performed within six months of plugging or annual test has not been completed. Submit results on Form 17. Contact area environmental protection specialist for sampling and analysis requirements if initial bradenhead pressure is greater than 25 psi.
 