| Engineer | Form: (04) 404465024 02/04/2026 | Well to be plugged or repaired within 6 months of identifying the integrity issue . Pressure is to be managed and mitigated until plugging or repair is complete. |
| Engineer | Form: (04) 404465024 02/04/2026 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Shut in bradenhead pressure shall not exceed threshold pressure.
3. If a sample has not been collected within the last twenty four months collect intermediate and production gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the COGCC within three months of collecting the samples.
4. For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD.
5. Complete a bradenhead test within 30 days of completing the repair and submit results on a Form 17
|