| Engineer | Form: (04) 403180454 10/24/2022 | 1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report
2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method.
3) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan - Include in sundry details on causal factors for intermediate pressure
4) Submit a current WBD on a Form 4 Sundry “COMPLIANCE with CONDITION OF APPROVAL (COA)” by 11/30/22
5) Complete installation of BH monitoring system by 1/31/2023
|
| Engineer | Form: (04) 404415533 02/25/2026 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. No later than 6/12/26, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, flow rate information and SCADA pressure data.
3. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead.
|