| Engineer | Form: (04) 403573905 11/28/2023 | 1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report or other Director approved submittal method.
2) Start P&A operations by 6/30/2024 |
| Permit | Form: (06) 403743025 04/16/2024 | Submit a form 5A to report the bridge plug @12200 identified on the wellbore diagram attached to the Notice of Intent. Include a wireline ticket. This Form 5A must be submitted within 30 days for compliance with Rule 416. |