COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403180077
10/17/2022
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report 2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method. 3) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan
EngineerForm: (04)
404015800
12/12/2024
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. No later than 6/26/2025, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, and the flow rate information and pressure data. 3.Shut in bradenhead pressure shall not exceed threshold pressure 4. If a sample has not been collected from surface casing within the last twelve months collect bradenhead gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples.
EngineerForm: (04)
404465120
01/29/2026
Well to be repaired within 6 months of identifying the integrity issue
EngineerForm: (04)
404465120
01/29/2026
1. Complete a bradenhead test within 30 days of completing the repair and submit results on a Form 17 2. Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure 3. After the wellhead seal repair, submit a Form 4 BHP Sundry that summarizes the repair results and current well condition. The sundry should include details of the future plans, bradenhead test description and pressure data.
 