WELL05-103-10631FEDERAL
299-34-1
TEP ROCKY MOUNTAIN LLC
96850
SI
7/1/2023
SAGE BRUSH HILLS II
76140
RIO BLANCO  103
NWSW 34 2S99W 6
316486View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
404269548
07/08/2025
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Well to be plugged or repaired within 6 months of identifying integrity issue- 12/23/25. Pressure is to be managed and mitigated until repair or plugging is complete. 3. Shut in bradenhead pressure shall not exceed threshold pressure.
OGLAForm: (06)
404399086
11/20/2025
This Location is within a CPW-mapped Aquatic Native Species Conservation Waters High Priority Habitat. Per the attached CPW Consultation, Operator has agreed to the following BMPs: 1. Minimization - Control erosion and sedimentation, and manage stormwater runoff; reclaim sites as quickly as possible to restore vegetation 2. Minimization - Maintain adequate spill response equipment at or near the Oil and Gas Location during subsequent operations.
OGLAForm: (06)
404399086
11/20/2025
This Location is within a CPW-mapped Elk Production Area and Mule Deer Migration Corridor HPHs. Per the attached CPW Consultation, Operator has agreed to the following BMPs: 1. Minimization - Preclude the use of aggressive CPW-identified non-native grasses and shrubs in mule deer and elk habitat restoration 2. Minimization - Reclaim mule deer and elk habitats with CPW-identified native shrubs, grasses, and forbs appropriate to the ecological site disturbed 3. Minimization - Implement speed restrictions for all lease roads and require that all TEP employees and contractors adhere to these posted speed restrictions
OGLAForm: (06)
404399086
11/20/2025
This Location is within a CPW-mapped Elk Production Area HPH. Per the attached CPW Consultation, operator has committed to completing the P&A outside of the TL (May 15-June 30).
OGLAForm: (06)
404399086
11/20/2025
This Location is within a CPW-mapped Greater Sage Grouse lek Site HPH. Per the attached CPW Consultation, Operator has agreed to the following BMPs: 1. Avoidance - Project construction activities will not occur during the TL (March 1-July 15) 2. Minimization - Preclude the use of aggressive non-native grassess in greater sage grouse habitat reclamation. 3. Minimization - Implement speed restrictions for all lease roads; all employees and contractors are required to adhere to these posted speed restrictions.
OGLAForm: (06)
404399086
11/20/2025
Due to proximity to a mapped wetland, operator will use secondary containment for all tanks and other liquid containers. Operator will implement stormwater BMPs and erosion control measures as needed to prevent sediment and stormwater runoff from entering the wetland and surface water.
EngineerForm: (06)
404399086
11/26/2025
Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent. Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line.
EngineerForm: (06)
404399086
11/26/2025
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
404399086
11/26/2025
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples.
EngineerForm: (06)
404399086
11/26/2025
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. 2) Prior to placing cement above the surface casing shoe. Verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders. 3) Pump surface casing shoe plug only after isolation has been verified. If surface casing cement is not circulated to surface, shut-in, WOC 4 hours then tag plug 4) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 5) After surface plug and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years. 6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed. 7) This well has federal minerals. Operator shall notify ECMC engineering staff of any plugging changes required by the BLM or unexpected conditions in the field prior to continuing operations.
 