Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-10501PICEANCE CREEK UNIT
T87X-3G-2
CAERUS PICEANCE LLC
10456
SI
5/1/2024
PICEANCE CREEK
68800
RIO BLANCO  103
SESE 3 2S97W 6
335796View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
403181483
11/15/2022
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report 2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method. 7) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan -Include diagnostic information on causal factors for intermediate casing pressure. 5) Complete installation of BH monitoring system by 3/31/2023 4) Perform diagnostics on BH and Intermediate pressures being the same and report results on Sundry required by COA#3
 
COGIS - Best Management Practice Results
No records to display.