| Engineer | Form: (04) 404465084 04/01/2026 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Well to be plugged or repaired within 6 months of identifying integrity issue- 05/8/25. Pressure is to be managed and mitigated until repair or plugging is complete.
3. Shut in bradenhead pressure shall not exceed threshold pressure.
4. Contact ECMC Engineering to discuss repair plans and timeline |