WELL05-103-10195PICEANCE CREEK UNIT
T32X-33G
QB ENERGY OPERATING LLC
10844
SI
7/1/2025
PICEANCE CREEK
68800
RIO BLANCO  103
NENW 33 2S95W 6
316301View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403181185
11/10/2022
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report 2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method. 3) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan -Include diagnostic information on causal factors for intermediate and surface casing pressure. 4) Complete installation of BH monitoring system by 2/31/2023
 