Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-10011SAGE BRUSH HILLS UNIT II
4514
QB ENERGY OPERATING LLC
10844
PR
12/1/2025
CORRAL CREEK
12000
RIO BLANCO  103
SWSW 32 1S99W 6
316211View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403611915
02/14/2024
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report or other Director approved submittal method. 2) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 3) Complete installation of BH monitoring system and repair by 8/14/2024 4) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan
EngineerForm: (04)
403694996
08/15/2024
Operator shall continue to monitor pressure and report to ECMC through annual testing. If monitored well conditions meet the thresholds defined by ECMC Rules a new bradenhead test and sundry must be filed.
EngineerForm: (04)
403914446
03/12/2025
No later than 6/04/2025, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the new proposed mitigation plan due to continuous flow at the end of the test, sample analysis interpretation, bradenhead test description, and the flow rate information and pressure data.
EngineerForm: (04)
403914446
03/12/2025
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Operator will implement measures to get an initial estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up. 3. If a sample has not been collected from surface casing within the last twelve months collect bradenhead gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples.
 
COGIS - Best Management Practice Results
No records to display.