Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-09887EUREKA UNIT
8816B P14 397
QB ENERGY OPERATING LLC
10844
IJ
3/1/2025
SULPHUR CREEK
80090
RIO BLANCO  103
SESE 14 3S97W 6
316135View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403609195
01/24/2024
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report or other Director approved submittal method. 2) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 3) Complete installation of BH monitoring system and repair by 07/24/2024
EngineerForm: (04)
403694980
08/15/2024
Operator shall continue to monitor pressure and report to ECMC through annual testing. If monitored well conditions meet the thresholds defined by ECMC Rules a new bradenhead test and sundry must be filed.
EngineerForm: (04)
404372876
12/10/2025
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. No later than 04/25/26, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition. The well should be shut in for seven days to monitor and collect data to characterize build up pressures prior to conducting the bradenhead test. The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, and the flow rate information and pressure data. 3. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up.
 
COGIS - Best Management Practice Results
No records to display.