Engineer | Form: (04 ) 401193406 2/7/2018 | This approval is good for one year and a new application must be made before January 25, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
Engineer | Form: (04 ) 401522761 2/7/2018 | This approval is good for one year and a new application must be made before January 23, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
Engineer | Form: (04 ) 401743341 9/18/2018 | This approval is good for one year and a new application must be made before January 23, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. |
Engineer | Form: (04 ) 401881246 2/27/2019 | This approval is good for one year and a new application must be made before 1 year from prior application. Updates for the planned utilization of the well should be included with the application. |
Engineer | Form: (04 ) 402264322 3/24/2020 | 1) This approval is good for one year and a new application must be made before 1/9/2021(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
Engineer | Form: (04 ) 402551645 4/27/2021 | 1)This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2)The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
Engineer | Form: (04 ) 402905177 2/1/2022 | 1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Please update status of all applicable months from SI to TA for 1/1999 forward. COGCC digital production reporting began in 1999 and does not go back to 1994.
3) Submit a Wellbore Diagram on a Form 4 Sundry |