| Engineer | Form: (04) 401434736 10/19/2017 | 1) Contact COGCC area engineer with depths of casing leaks for approval of repair procedure.
2) This well has federal minerals. Operator shall notify COGCC engineering staff of any procedure changes required by the BLM or unexpected conditions in the field as soon as feasible.
3) Submit revised formation tops, CBL and changes to wellbore on Form 5 if cement is pumped. Form 4 if cement is not pumped.
|
| Engineer | Form: (04) 401747689 09/06/2018 | This approval is good for one year and a new application must be made before August 29, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
|
| Engineer | Form: (04) 402141294 04/01/2020 | 1) This approval is good for one year and a new application must be made before 8/22/2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 402752669 12/21/2021 | 1) This approval is good for one year and a new application must be made before 8/22/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|