Engineer | Form: (04 ) 401185906 3/13/2018 | This approval is good for one year and a new application must be made before January 16, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
Form 7 reporting must reflect the well status dates reported on the TA request.
|
Engineer | Form: (04 ) 401513601 3/13/2018 | This approval is good for one year and a new application must be made before January 15, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
Form 7 reporting must reflect the well status dates reported on the TA request.
|