Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-08688CHEVRON FEE
128X
SCOUT ENERGY MANAGEMENT LLC
10779
AC
6/1/2023
RANGELY
72370
RIO BLANCO  103
SWSE 22 2N102W 6
315548View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
401513171
2/1/2018
This approval is good for one year and a new application must be made before January 15, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
401184512
2/1/2018
This approval is good for one year and a new application must be made before January 13, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
401680398
6/26/2018
This approval is good for one year and a new application must be made before June 20, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
401869568
4/16/2019
This approval is good for one year and a new application must be made before June 20, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
402269668
3/30/2020
1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
402551544
4/15/2021
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
402584650
4/19/2021
1) This sundry to conduct bradenhead diagnostic evaluations is valid until 1/27/2022 2) For Wells that have sustained casing pressure above the action threshold as determined through diagnostic testing and evaluation, the Operator will provide a PMP with the Form 4, including a description of the Operator’s findings from the previous year, number of times the well was blown down and future plans for more frequent monitoring or testing, pressure mitigation, or remedial well work by 1/27/2022 3) Submit the gas sample analysis from previous Form 17 bradenhead test on a Form 43
EngineerForm: (04 )
402677171
5/3/2021
1) Complete a Form 4-Report of Work Done Sundry noting any changes to Bradenhead pressure
EngineerForm: (04 )
402905359
2/2/2022
1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Please update production reporting status of all applicable months from SI to TA for 1/1999 forward. COGCC digital production reporting began in 1999 and does not go back to 1986.
 
COGIS - Best Management Practice Results
No records to display.