COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
401513593
3/13/2018
This approval is good for one year and a new application must be made before January 15, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401185843
3/13/2018
This approval is good for one year and a new application must be made before January 16, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401700810
10/2/2018
This approval is good for one year and a new application must be made before January 15, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401870376
4/16/2019
This approval is good for one year and a new application must be made before January 15, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
UICForm: (02 )
401838975
10/1/2019
1. Injection is not authorized until Subsequent Forms 31 and 33 are approved. 2. Retrieve water sample(s) from injection zone(s) before stimulating formation. Samples must be analyzed for Total Dissolved Solids at a minimum. 3. PRIOR TO PERFORMING OPERATIONS: Operator is required to contact COGCC to discuss acid and fracturing jobs. Approval of Form 4 may be required for acid and fracturing jobs. (As of 4/13/2016) 4. PRIOR TO PERFORMING OPERATIONS: Operator is required to contact COGCC to discuss Step Rate Test or Injectivity Test criteria for Maximum Surface Injection Pressure determination. Prior approval of Form 4 may be required for step rate and injectivity tests. 5. Operator must provide all tops of formations encountered from surface to TD on a Form 5 if one is needed or on a Sundry. 6. Well must pass MIT witnessed by COGCC before Subsequent Forms 31 and 33 will be approved. Well in must be in injection configuration. 7. Operator must have approved eForm version(s) of Form 26(s) on file before Form 31-Subsequent and Form 32-Subsequent will be approved. Operator is required to file Form 26 updates on a quarterly basis if they have wells that need to be added or deleted.
EngineerForm: (04 )
402269678
3/31/2020
1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
402423448
6/16/2020
1) Report cement squeeze on form 5 2) Notify area engineer of leak location and TA or P&A plans.
EngineerForm: (04 )
402561619
1/19/2021
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
402910135
2/8/2022
1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
 
COGIS - Best Management Practice Results
No records to display.