| Engineer | Form: (04) 400497615 10/17/2013 | 1. Perform mechanical integrity test before returning to injeciton. 2. File Form 42 ten days before mechanical integrity test. |
| Engineer | Form: (04) 401521447 03/22/2018 | This approval is good for one year and a new application must be made before January 22, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
The Form 7 reporting must reflect the well status dates reported on the TA request. |
| Engineer | Form: (04) 402129255 03/24/2020 | 1) This approval is good for one year and a new application must be made before 7/31/2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 402264391 03/26/2020 | 1) This approval is good for one year and a new application must be made before 1/9/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 402551523 04/15/2021 | 1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402905276 02/01/2022 | 1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Please update production reporting status of all applicable months from SI to TA for 7/2019 forward.
|