Engineer | Form: (04 ) 402436482 7/6/2020 | 1)At least once a year shut in bradenhead for 7 days and perform a bradenhead test if pressure builds to 150 psi. Report results on operator’s annual spreadsheet and on a Form 17 if bradenhead test was performed.
2)Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges.
3)Any liquids blown down are to be collected, stored, handled, and treated or disposed as E&P waste per COGCC’s 900 series rules.
4)At least one check valve is required for annular spaces that are tied to sales. Maintain equipment for pressure regulation and check valves in good working order.
|