| Engineer | Form: (04) 400415443 05/08/2013 | Tracer or temperature survey will be performed to determine there is no vertical migration of fluid along with mechanical integrity test before well is returned to injection. |
| Engineer | Form: (04) 400787122 02/26/2015 | Rule: 326.a.1.A: Isolation of the tubing-casing annulus with a packer set at 100 feet or less above the highest open injection zone perforation, unless an alternate isolation distance is approved in writing by the Director. On next MIT, if it isn't possible to set packer 100 feet or less above top of liner; send explanation and get prior approval for alternate setting depth of packer from the UIC control lead. |
| Engineer | Form: (04) 401529915 05/22/2018 | This approval is good for one year and a new application must be made before January 30, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 401746949 09/18/2018 | This approval is good for one year and a new application must be made before January 30, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. |
| Engineer | Form: (04) 401873838 04/23/2019 | This approval is good for one year and a new application must be made before January 30, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application. |
| Engineer | Form: (04) 402269634 03/30/2020 | 1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 402562399 01/12/2021 | 1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. |
| Engineer | Form: (04) 402910123 01/12/2022 | 1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. |
| UIC | Form: (04) 403223439 03/16/2023 | Updated well classification to Observation Well. Used 11/09/2022 as date well is no longer an injector. Operator to report this well as AC (Active) on Form 7. |