Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-07283CARNEY C T
24X35
SCOUT ENERGY MANAGEMENT LLC
10779
PR
10/1/2025
RANGELY
72370
RIO BLANCO  103
NWNE 35 2N102W 6
314804View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
401188719
03/22/2018
This approval is good for one year and a new application must be made before January 19, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04)
401517097
03/22/2018
This approval is good for one year and a new application must be made before January 17, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04)
401722414
08/06/2018
This approval is good for one year and a new application must be made before January 17, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
401878850
04/23/2019
This approval is good for one year and a new application must be made before January 17, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
402269640
03/30/2020
1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04)
402551318
04/12/2021
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
402904612
01/11/2022
1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
404078804
02/04/2025
1) For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 2) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run. 3) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations 4) Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure. 5) Complete a Form 21 MIT to verify repairs for injection wells
 
COGIS - Best Management Practice Results
No records to display.