Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-06289SHARPLES-MCLAUGHLIN
8-33
SCOUT ENERGY MANAGEMENT LLC
10779
TA
3/1/2023
RANGELY
72370
RIO BLANCO  103
SWNW 33 2N102W 6
311807View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
401195921
5/22/2018
This approval is good for one year and a new application must be made before January 27, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401524930
5/22/2018
This approval is good for one year and a new application must be made before January 24, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401745183
9/18/2018
This approval is good for one year and a new application must be made before January 24, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
401873358
4/22/2019
This approval is good for one year and a new application must be made before January 24, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
402269630
3/30/2020
1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
402561408
1/20/2021
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
402909944
2/8/2022
1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Please update production reporting status of all applicable months from SI to TA for 1/1999 forward. COGCC digital production reporting began in 1999 and does not go back to 1990. 3) Submit a current Wellbore Diagram on a Form 4 Sundry
 
COGIS - Best Management Practice Results
No records to display.