COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
401526855
2/7/2018
This approval is good for one year and a new application must be made before January 26, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
401746108
9/18/2018
This approval is good for one year and a new application must be made before January 26, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
AgencyForm: (04 )
401881335
2/26/2019
This approval is good for one year and a new application must be made before 1 year from prior application. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
402264512
3/26/2020
1) This approval is good for one year and a new application must be made before 1/9/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
402562207
1/13/2021
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) Conduct 5 year UIC/Maintain TA Status MIT by 8/15/2021
EngineerForm: (04 )
402910095
2/8/2022
1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. 4) Submit a current Wellbore Diagram on a Form 4 Sundry
 
COGIS - Best Management Practice Results
No records to display.