UIC | Form: (04 ) 402108212 7/30/2019 | Repair or plug and abandon the Fee 22 by 9/20/2019. If repaired Fee 22 must pass an MIT witnessed by COGCC before it can be returned to injection. File a Form 5 to report well work. File a Form 5A as needed to report any changes to perforations or in tubing/packer configuration. |
Engineer | Form: (04 ) 403082716 6/21/2022 | 1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes submit an updated WBD.
2) If wellbore geometry changes or cement work is executed, submit information on a Form 5
3) Complete a Form 21 MIT to verify repairs for injection wells
4) If a casing leak is identified, contact area engineer with repair plans
|