| Engineer | Form: (04) 401182456 02/28/2018 | This approval is good for one year and a new application must be made before January 11, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. |
| Engineer | Form: (04) 401510524 02/28/2018 | This approval is good for one year and a new application must be made before January 11, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. |
| Engineer | Form: (04) 401628770 05/18/2018 | This approval is good for one year and a new application must be made before May 3, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. |
| Engineer | Form: (04) 401868097 04/15/2019 | This approval is good for one year and a new application must be made before May 3, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application. |
| Engineer | Form: (04) 402266904 03/26/2020 | 1) This approval is good for one year and a new application must be made before 1/9/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 402551632 04/20/2021 | 1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402905166 01/27/2022 | 1) This approval is good for one year and a new application must be made before 01/09/2023 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) Submit a Wellbore Diagram on a Form 4 Sundry
|
| Engineer | Form: (04) 403870496 07/31/2024 | 1) For applicable operations, submit a Form 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run |
| Engineer | Form: (02) 403986663 12/16/2024 | 1) Submit Form 42 electronically to ECMC 2 business days prior to MIRU
2) If a sample has not been collected within the last twelve months collect bradenhead and production gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples. Sampling is required to be completed prior to the the submission of the Form 33 Subsequent.
3) If remedial cement is placed, it shall be verified with a CBL and Form 21 MIT
4) Operator shall provide cement coverage from the second Liner shoe to the liner top. Verify cement coverage with a cement bond log.
|