Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-06091CARNEY C T
6-5
SCOUT ENERGY MANAGEMENT LLC
10779
AC
5/1/2023
RANGELY
72370
RIO BLANCO  103
NWNE 5 1N102W 6
314549View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
401517856
3/22/2018
This approval is good for one year and a new application must be made before January 10, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401188947
3/22/2018
This approval is good for one year and a new application must be made before January 19, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401733436
8/17/2018
This approval is good for one year and a new application must be made before January 10, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
401880369
2/28/2019
This approval is good for one year and a new application must be made before January 10,2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
402551381
4/15/2021
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
402903450
1/11/2022
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. 4) Submit a Wellbore Diagram on a Form 4 Sundry
UICForm: (04 )
403220824
4/4/2023
Updated well classification to Observation Well. Used 11/07/2022 as date well is no longer an injector. Operator to report this well as AC (Active) on Form 7.
 
COGIS - Best Management Practice Results
No records to display.